The 99 Street Bridge over Whitemud Drive will be rehabilitated. Construction is anticipated to begin in early 2027 and conclude in late 2027.
About the Project
A 2023 condition assessment identified that the 99 Street Bridge over Whitemud Drive requires major rehabilitation to extend its lifespan and improve safety for motorists, cyclists and pedestrians.
To minimize impacts, construction will be accelerated, and the bridge temporarily closed, so construction can take place in a single season. During this time, the bridge will be closed to all northbound and southbound traffic.
Travel along Whitemud Drive eastbound and westbound, including all on-ramps and off-ramps to and from Whitemud Drive, will remain accessible. Detour routes will be shared prior to construction.
This project work includes:
- Repairing the concrete bridge deck, other bridge components, gutters, sidewalks and traffic barriers
- Replacing the bridge deck joints and pedestrian railways
- Changing the bridge deck road surface from asphalt roadway to high-performance concrete
- Asphalt repaving at the bridge approaches and extending north of the bridge, going west from 99 Street to Gateway Boulevard and going north of the bridge to 44 Avenue
Project Timeline
2026
2027
Contact Us
Mitchell S
Engineering Project Manager, Transportation Infrastructure Delivery