Final Grade approval for Commercial, Industrial, Institutional & Multi-Family properties must be completed within 18 months of the building permit being issued for the premises.

The following steps are required to obtain Final Grade Approval:

  1. The developer, builder, contractor, or owner submits the certified As-built Plan (Lot Grading Certificate) to City of Edmonton Development Services.
  2. A lot grading inspector will conduct a site inspection to verify that the lot is graded in accordance with the approved Lot Grading Plan and the Lot Grading Guidelines. This is usually done within 5 working days from processing of the certificate, depending on workload and weather conditions. 
  3. A Lot Grading Inspection Report will be sent to the developer, builder, contractor, or owner indicating whether the lot grading has Passed (approved) or Failed (deficiencies exist) the inspection.
  4. The developer, contractor, builder, or owner must correct any deficiencies within 60 days (unless otherwise noted) and call 311 to arrange for a re-inspection (applicable fees apply). The applicant will receive an approval report and the Lot Grading Certificate when Final Grade is approved.  

Note: Final Grade Approval will not be given until City of Edmonton, Development Services receives the original As-Built Plan and determines that all fees have been paid.

For More Information

Development Services, Lot Grading

2nd Floor, Edmonton Tower
10111 104 Avenue NW
Edmonton, AB

T5J 0J4

Telephone

311 or 780-496-5576

Fax 780-496-2865
Email lot.grading@edmonton.ca