Northeast Road Reconstruction is the replacement of roads with special drainage enhancement (and, where required, selective concrete repair) caused by soft subgrade conditions that exist in the northeast neighbourhoods of Mayliewan, Ozerna, Matt Berry, Hollick Kenyon, Canossa and Elsinore. During construction, access is limited and residents will be affected by parking restrictions. Prior to the start of work, a construction bulletin will be sent outlining the work to be done and parking restrictions.

Construction Update - Spring 2018

As part of the 2018 construction program, the City of Edmonton, Integrated Infrastructure Services, will be involved in roadway construction at the following locations. Each bulletin includes a map showing the scope of work for this construction season.

Construction Bulletin 18-1503-01 - April 2018

  • Loop of 155 Avenue West of 59A Street
  • 157 Avenue Cul-De-Sac West of 64 Street
  • North of 156 Avenue loop of 61A Street to 157 Avenue to 61B Street
  • 62B Street Cul-De-Sac West of 156 Avenue
  • 63 Street Cul-De-Sac East and West of 156 Avenue

Construction Bulletin 18-1504-01 - April 2018

  • Ozerna Road from 163 Avenue to 165 Avenue
  • 155 Avenue Cul-De-Sac East and West of 54 Street
  • 156 Avenue Cul-De-Sac East and West of 54 Street
  • Loop East of 59A Street from 162 Avenue to 162B Ave
  • 162A Avenue Cul-De-Sac West of 59A Street
  • 162B Avenue Cul-De-Sac West of 59A Street

Project History

Canossa and Elsinore Open House - April 2017

The City held an Open House on April 20 to display and explain the proposed sub-drain installation and roadway reconstruction of areas in Canossa and Elsinore. This was an opportunity for residents to understand why the work is being completed and to discuss how construction will affect them.

Open House - May 12, 2016

The City held an open house on May 12 to display and explain the construction map, staging map, traffic detour map and pedestrian detour maps. This was also an opportunity to inform residents about the new temporary traffic signal, which will be installed at the walkway located at 74 Street South of 158 Avenue and explain how this signal will function. Also, during construction the intersection of 158 Avenue and 78 Street will be closed to all traffic.

Construction Locations:

  • 158 Avenue from 74 Street to 157 Avenue
  • 74 Street cul-de-sac North of 158 Avenue
  • 76 Street cul-de-sac North and South of 158 Avenue
  • 76A Street cul-de-sac North of 158 Avenue
  • 158 Avenue from 77 Street to 78 Street

For More Information

Clinton Mah

Telephone

780-423-5004

Email clinton.mah@edmonton.ca

Building Great Neighbourhoods

All additional inquiries or escalations can be directed to the Building Great Neighbourhoods team, or by calling 311.

Email buildinggreatneighbourhoods@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content