When a Development Permit is Required
1. A development permit is required for a proposed swimming pool if it's on a property that abuts a valley or ravine as identified in the North Saskatchewan Valley and Ravine System Protection Overlay.
2. A development permit is not required if a proposed swimming pool meets the required setbacks for accessory structures, as outlined in Section 50.3(5) of the Edmonton Zoning Bylaw. Otherwise, a development permit is required.
Application Procedure
Apply Online
Create an account, apply, pay and check application status.
Homeowners
Apply
Contractors and Professionals
Apply
Apply In Person
If there is an existing fence around your property and it meets the requirement, submit a letter of confirmation along with your application.
Fill in the Home Improvement Application form.
Include all information as requested, as well as all application fees.
Permit Conditions
The yard containing the swimming pool must have a fence with a minimum height of 1.8m (6 ft) and must completely enclose the swimming pool.
The gate must be the same height as the fence and must be self-closing.
The latch should lock and be installed on the inside of the gate at least 1.5m (5 ft) off the ground.
These regulations apply to a contained body of water.
Processing
- A development officer will review the application according to the Edmonton Zoning Bylaw. Once approved, a development permit will be issued.
- If there is a relaxation required, public notification is required. The notification period, in which your neighbours may appeal the development officer's decision, is approximately four weeks.
- A plan examiner will review the application, if required. A building permit will be issued at this stage.
- If an application is refused, an appeal can be made through the Subdivision and Development Appeal Board, Churchill Building, 10019-103 Avenue NW, Edmonton, AB, T5J 0G9, Phone: 780-496-6079.
In Person |
City of Edmonton
2nd Floor, Edmonton Tower, 10111 104 Avenue NW
Edmonton AB T5J 0J4
Hours of Operation: 8am–4:30pm
Monday through Friday
|
Mail |
Mailing address is listed above. Cheques must be payable to the City of Edmonton. Please allow for additional processing time when applications are mailed
|
By Phone |
311
|