Lot Grading Inspections - Residential Properties
Lot grading requirements and approval procedures for residential homeowners
New mandatory public health measures are in effect across Alberta to protect the health system and slow the spread of COVID-19. Learn more at edmonton.ca/COVID-19.
Main page content begins here
An overview of rough grade approvals for residential properties.
This stage includes backfilling the foundation walls and shaping the lot to conform to the design of the approved Lot Grading Plan. The Rough Grade Approval procedure should occur within 60 days of the initial site grading or within 18 months of the issuance of the building permit. It is the builder's responsibility to ensure that roof leaders (downspouts) and foundation drainage systems are installed according to the approved engineering drawings.
Regardless of who applies for grade approval, the Municipal Government Act states that a Property Owner is responsible for all activities and approvals related to his property.
2nd Floor, Edmonton Tower
10111 104 Avenue NW
Edmonton, AB
T5J 0J4
Telephone | 311 |
---|---|
Fax | 780-496-2865 |
lot.grading@edmonton.ca |
End of page content. Please choose between the following five options:
Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content