Project History on replacing the existing Mill Woods Transit Centre to offer a closer connection to the future Mill Woods Stop on the Valley Line LRT.

About the Project

This project is aligned with the Mill Woods Station Area Redevelopment Plan implementation. The new Transit Centre will be an approximate 1-2 minute walk (100m) from the future Mill Woods Stop on the Valley Line Southeast LRT Extension.

The transit centre has been designed to simplify transit to transit connections and will integrate with the future private development and active pedestrian transportation network in the area. This project aligns with the planned Transit Oriented Development (TOD) on the site.