Main page content begins here

The City is committed to creating ways to access the river valley by building, rehabilitating and maintaining connected stairs and trails.

About the Project

Currently, there are 5 locations where stairs are in various project stages for renewal work:

These stairs have exceeded their lifecycle and do not meet City standards. Safety improvements will be implemented as the stairs are either replaced or renewed. Connecting trail access points will also be enhanced and rehabilitated where required.

Public Engagement

Learn more about these stair rehabilitation projects and share your thoughts.

Grandview Heights Stairs

A public engagement event to discuss the concept plan with stair users and local residents will be scheduled in April 2019.

Jackson Heights Stairs

A public engagement event to discuss the concept plan with stair users and local residents will be scheduled in April 2019.

River Valley Stairs Rehabilitation Survey

The survey is open until February 28, 2019

For More Information

Open Space Planning and Design

14th Floor, Edmonton Tower
10111 - 104 Avenue NW
Edmonton, AB T5J 0J4

Telephone

In Edmonton: 311
Outside Edmonton: 780-442-5311

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content