The Edmonton Spectrum property
An aerial photo of the Edmonton Spectrum property in 2015 (when the property was known as the Northlands Park Racetrack & Casino).

The project is demolishing structures on the Edmonton Spectrum property (formerly known as the Northlands Park Racetrack & Casino).

Coliseum Demolition Project

The Coliseum Deconstruction and Site Redevelopment will demolish the Coliseum building (formerly known as the Northlands Coliseum, Rexall Place, Skyreach Centre and the Edmonton Coliseum), as well as specific site infrastructure and redevelop the interim site. 

This project is separate from the Edmonton Spectrum Demolition.

Project Update - August 2026

Hazardous materials abatement has been completed on all structures on the property, and the following structures have been demolished: 

  • Chiller building (including the satellite dishes east of the building) 
  • Winter barns
  • Veterinary building
  • 79 Street barns
  • Winner’s Circle 
  • Racetrack in-field tunnel 
  • Control Office building (also known as the jockey dormitory building)

Demolition work has begun on the Edmonton Spectrum building (formerly known as the Northlands Spectrum). 

The project, which includes the remaining demolition work, as well as site remediation and regrading—is anticipated to be completed in fall 2026. 

About the Project

After 118 years as a horse racing facility, the Northlands Park Racetrack & Casino closed in 2019. After the City of Edmonton returned the vacant property to its property portfolio, it served various purposes before preparations began for its future development as part of the Edmonton Exhibition Lands development.

In preparation for the next phase of this development, the City of Edmonton is demolishing structures on the Edmonton Spectrum property, located at 7410 Borden Park Road NW. Following demolition, these areas will be regraded (a process that reshapes the land to ensure proper drainage and stability) so that they may be prepared for future development.

The project involves hazardous materials abatement, site remediation and regrading, demolishing constructed structures and decommissioning relevant site utilities. 

The project is demolishing the:

  • Edmonton Spectrum building (formerly known as the Northlands Spectrum)
  • Chiller building
  • Winter barns
  • Veterinary building
  • Winner’s Circle
  • Racetrack in-field tunnel
  • Satellite dishes east of the chiller building
  • 79 Street barns
  • Control Office building (also known as the jockey dormitory building)

Edmonton Spectrum Demolition Area Map The demolition of these structures is being completed using heavy equipment, including excavators, cranes and dump trucks.

Impacts of the Demolition

The demolition does not pose a health or safety risk as all hazards are being managed. Steps are being taken to reduce dust, as well as minimize noise and vibrations. The project is not anticipated to impact events or parking at the Edmonton EXPO Centre.

After the Demolition Project

The land will become part of the Edmonton Exhibition Lands development. The planning, design and construction associated with any future development are not part of the demolition project.

Photo Gallery

Frequently Asked Questions

Why has the Edmonton Spectrum building been shuttered for so long?

Extensive land use and development planning had to be completed before the demolition and development could move forward. This planning was guided by the vision outlined in the Edmonton Exhibition Lands Planning Framework (10.03 MB) and Implementation Strategy.

Why wasn’t the Edmonton Spectrum building repurposed?

In 2023, the Edmonton Spectrum building was deemed unsuitable for occupancy.

Will the demolition work impact events at Borden Park?

No, the demolition work is not anticipated to impact events at Borden Park.

Will the demolition work impact the Borden Natural Swimming Pool?

No, the demolition work is not anticipated to impact the pool and its operations.  

What is the Edmonton Exhibition Lands development?

The Edmonton Exhibition Lands is developing more than 80 hectares (200 acres) of centrally located land that will provide opportunities for Edmontonians to live, work and play in new ways, only minutes from downtown and easily accessible by multiple modes of transportation.

Project Timeline

Project lifecycle timeline with the build phase highlighted

2026

Fall

  • Anticipated project completion
  • Demolition work is anticipated to be completed

Summer

  • Demolition work continues
  • Hazardous materials abatement has been completed.

Early

  • Demolition work began
  • Hazardous materials abatement continued

2025

Fall

  • On-site work began with hazardous materials abatement

 

Contact Us

Facility Infrastructure Delivery

Email  FacilityInfrastructureDelivery@edmonton.ca