Residential snow clearing varies depending on the type of roadway and design.
Snow clearing on residential roadways is a Priority 4 service level (14 days when called) and occurs during a Residential (Phase 2) parking ban.
Residential roadways are groomed to maintain a minimum 5 cm base to reduce windrow size and prevent flooding during melts. Below-zero temperatures and frozen snowpack are necessary for grooming to occur.
Crews groom and level residential roadways during a Residential Parking Ban or as needed to address uneven areas. Parked vehicles on the roadway can result in inconsistent grooming or prohibit crews from maintaining the roadway. Traction material is only applied at entrances and high-risk intersections.
Residents can report severe rutting or winter road concerns via 311 to help coordinate service delivery. To track schedules, sign up for automated email and text alerts through the Service Notifications platform or view the interactive Roadways Snow Clearing Map.
Understanding Windrows
A windrow is a pile of snow created by plowing.
Windrows can restrict on-street parking and residents are encouraged to park their vehicles on their property (for example, on driveways, parking pads or in garages).
In residential neighbourhoods, windrows along roadways and alleys will not be removed. City crews will work to minimize the height of windrows at driveway entrances. If a windrow is greater than 30 cm in height and fully blocks a residential driveway, smaller equipment will open up driveway entrances to 1.5 car widths, typically within 24 hours.
The City will clear windrow blockages from corner crosswalks and wheelchair ramps to preserve pedestrian accessibility. City crews, when plowing or blading roads, try their best to ensure that windrows do not encroach on sidewalks. In some cases, when there is a lot of snow, some may spill onto sidewalks. If the spillover impacts use of the sidewalk itself or encroaches more than 0.5 metres, crews will clear it away.
If windrows are blocking sidewalks or have caused a safety concern, please contact 311 to report it. Crews will be sent out within 1–2 days.
Cul-de-sac Clearing
Cul-de-sac clearing is completely separate from residential roadways. While a Residential Parking Ban applies to cul-de-sacs, clearing is not done during the parking ban.
Cul-de-sac clearing occurs after residential roads and involves different equipment for both plowing and removing the snow. Cul-de-sacs are cleared to bare pavement to reduce the risk of flooding.
Due to the size and design of cul-de-sacs, smaller snow clearing equipment is required. Cul-de-sacs are cleared systematically in response to large storm events, or when conditions warrant, on average 1–2 times per year. Operations run strictly during daytime hours from 7am-7pm, with localized "No Parking" signage posted at cul-de-sac entrances 24 hours in advance. The operation takes place in two distinct stages:
- Stage 1 (stacking): Front-end loaders scoop accumulated snow from driveway boundaries and stack it into a centralized mound in the middle of the cul-de-sac.
- Stage 2 (hauling): A separate hauling team arrives at a later date to load the central snow mound into haul trucks for transport to one of the City's snow storage facilities.
When clearing occurs, residents must keep cul-de-sacs and entrances completely clear of parked vehicles. For public safety, parents must ensure children do not play on or dig tunnels into central snow stacks while they await hauling. Municipal enforcement officers issue $250 parking tickets in cul-de-sacs exclusively while crews and officers are actively on site.
Cul-de-sac clearing takes 4–6 weeks for crews to complete the 3,000 cul-de-sacs in Edmonton.
Residential Alleyways
Alleys and back lanes are cleared to maintain access for emergency response and municipal waste collection services. Parking in alleys is strictly prohibited during active clearing operations to prevent equipment obstruction.
During a Residential Parking Ban, alleys adjacent to active parking ban roadways are not directly subject to the ban itself. Alley clearing is conducted following the completion of the parking ban.