The 122 Avenue collector road construction is now complete.

About the Project

A Concept Plan was developed for 122 Avenue between 107 Street and Fort Road prior to undergoing road reconstruction in 2017. The intent was to update the roadway and ensure road design consistency across the 5 neighbourhoods located along the corridor. Road reconstruction included the complete removal and reconstruction of road surfaces, curbs and gutters, and street lights.

An emphasis was placed on function within the communities and efforts were made to reduce speeding and shortcutting while accommodating the needs of motor vehicle traffic, transit, pedestrians and cyclists, as is possible within the roadway parameters. Through input from area residents and businesses, as well as area stakeholders, existing issues were identified and neighbourhood priorities were incorporated into the design, where possible.

Project History

Project Update - May 2018

Reconstruction of 122 Avenue from 92 Street to Fort Road began in May with completion in fall 2018.

Traffic Impacts

92 Street to 82 Street
During construction, one side of the road will be closed at a time. One-way traffic on the other side of the road will be maintained. The directional closure will be completed in phases and every third intersection will remain open (two intersections in between will be closed). ETS buses travelling east and westbound will be detoured.

82 Street to Fort Road
A full road closure will be implemented in phases, however every third intersection will remain open (two intersections in between will be closed).

Access to businesses, emergency access and residences will be maintained for the entire route at all times.

Open House - April 2016

The City held an open house on April 27, 2016 to present the recommended concept plan.

Meeting Materials:
Display Boards
Project Map - East
Project Map - West
What We Heard

Open House - November 2015

The City held an open house on November 24, 2015 to present the concept plan and show how we used your feedback to help inform the design. Below are the materials from the meeting and the presentation that was given.

Meeting Materials:
Presentation
Fact Sheet
Display Boards
What We Heard
Draft Concept Plan - 77 Street to 92 Street
Draft Concept Plan - 92 Street to 107 Street

Drop-In Open House - June 2015

Members of the public were asked to share their thoughts about travelling along this route and what improvements could make the roadway for comfortable from all road users, including pedestrians, cyclist, motorists and transit.

Meeting Materials:
Presentation

For More Information

Ashfaque Ahmed

Title Construction Project Manager
Telephone

780-508-9135

Email ashfaque.ahmed@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content