Main page content begins here

Each property must dispose water from the downspouts and the sump pump discharge in the manner specified by the site servicing requirements (EPCOR):

  • Foundation Drain Service: The weeping tile must be connected to the foundation service
  • Storm Service: All downspouts and the weeping tile must be connected to the storm service

The following pictures illustrate the connections of sump pump and downspouts to the service pipe:

For More Information

Drainage Planning and Engineering

2nd Floor, Edmonton Tower
10111 104 Avenue NW
Edmonton, AB
T5J 0J4

Telephone

311 or 780-496-5444

Fax 780-496-3629
Email wass.drainage@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content