Main page content begins here

At two stages during construction, the builder or homeowner is required to have the lot inspected for grading approval. To make sure the house and lot are constructed in accordance with all requirements, you should be familiar with the procedure for both the rough grade and final grade stages.

In new subdivisions, developers often require a refundable deposit to ensure conformance with the Lot Grading Plan and architectural guidelines. Inquiries about deposits or architectural guidelines should be directed to the homebuilder or developer.

For More Information

Drainage Planning and Engineering

2nd Floor, Edmonton Tower
10111 104 Avenue NW
Edmonton, AB

T5J 0J4

Telephone

311 or 780-496-5576

Fax 780-496-2865
Email lot.grading@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content