The Walterdale Bridge spans the North Saskatchewan River, connecting the intersection of Queen Elizabeth Park Road and Walterdale Hill to the south side with 105 Street to the north.

Shared-Use Path Closure Starts May 22, 2018

On May 22, the City of Edmonton will close the east side of the Walterdale Bridge shared-use path in order to complete work at its south and north accesses. The west sidewalk will remain open to pedestrians and cyclists during this time.

Crews will finalize finishing work and install permanent connections to replace the temporary ones that were developed during the winter.

The closure is expected to last 3 weeks. The path will reopen sooner if the work is completed ahead of schedule.

Closure and Detour Routes

Walterdale Bridge Traffic Map

  • Kinsmen traffic to new bridge will exit using existing road; access will be realigned once all traffic, pedestrians and cyclists are using the new bridge
The new signature bridge will be the first of its kind in Edmonton.
An interactive look at the structure of the new bridge.

Live video stream of the bridge from both sides of the river.

View of the river valley and the new Walterdale Bridge. Images updated every 15 minutes.

Planning and design of the new bridge.

Get an up-close look at the bridge as it was being built.

For More Information

311

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

TTY 780-944-5555 and press 0
Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content