Project Update - May 2020

Construction began in May 2020 and is expected to be complete in January 2022. Work in 2020 will be focused on constructing new accesses at the end of each platform and permanently closing the underground concourse, while future work will be focused on constructing a new overhead canopy.

The City is committed to maintaining access and transit operations at Stadium LRT Station as much as possible throughout construction; however, service changes may be required. For the most up to date service impacts, please visit Transit General Service Alerts.

Project Timeline

Project Life Cycle Design Phase

May 2020 - January 2022

  • Detailed design and construction 

2019

  • Design development

2018

  • Preliminary design
  • Public engagement (Phase 2)

What We Heard Report - December 2018

2017

  • Concept development
  • Public engagement (Phase 1)

2010-2017

  • Various studies and an updated Stadium Station Area Redevelopment Plan identified need for upgrades to the station

Project Overview

Studies completed in recent years identified the need for upgrades to the Stadium LRT Station. An updated Stadium Station Area Redevelopment Plan (ARP) completed in 2017 confirmed the need to align these upgrades with planned Transit Oriented Development in the area.

Feedback gathered during public engagement was summarized into 3 key themes:

  • Safety and Security
  • Comfort
  • Barrier-free Accessibility

What We Heard Report

Through planning and preliminary design of the redevelopment work, the following priorities were outlined:

  • Design elements that increase passenger safety, comfort and connectivity
  • Improvements to accessibility and flow and to ensure the LRT station and transit centre are connected, allowing people to move safely and efficiently
  • Improvements for more efficient and sustainable long-term maintenance and operations
  • Replace and repair outdated and damaged areas in the existing station
  • Incorporate land-use integration with the Stadium Station Area Redevelopment Plan which was approved by City Council in February 2018.

Planned upgrades included in the design include:

  • New platform added on the west side of the tracks (the existing platform would remain to serve northbound passengers)
  • Barrier-free access at the end of each platform
  • Removal of the underground concourse
  • Added access point to the new southbound platform connecting the pathway between the station and Commonwealth Stadium
  • New heated shelters on each platform and at the Stadium Transit Centre (buses)
  • New public washrooms
  • Enhanced lighting
  • New bike parking
  • Added pedestrian track crossings at both ends of the station
  • Connections to the multi-use trails on both sides of the tracks
  • Removal of 69 trees from the area
  • Planting 151 new trees in the area

Photo Gallery

Updated design renderings (2020)

Preliminary design renderings (2018)

Fund Contributors

Investing in Canada logo


 

 

City of Edmonton logo

For More Information

Facility Planning and Design

12th Floor, Edmonton Tower
10111 104 Avenue NW
Edmonton, AB
T5J 0J4
Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

Email facilityplanninganddesign@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content