The MacKenzie Ravine Boardwalk will be removed and the staircase will be replaced. Construction is anticipated to begin in 2027.
Project Update - November 2026
The timber boardwalks and staircase will be closed for the winter, starting in mid-November and will remain closed until construction is complete in fall 2027. Construction will be completed in 2 phases: removal work in spring and construction work in summer.
There will be no through access to this section of the ravine from mid-November 2026 until fall 2027 while seasonal and construction closures are in place.
Project Overview
The timber boardwalks and staircase located within the Mackenzie Ravine near 142 Street and 93 Avenue have reached the end of their service life. These structures provide pathway connectivity through the Mackenzie Ravine to the adjacent Crestwood and Parkview neighbourhoods, Buena Vista Park and along the North Saskatchewan River Valley.
In spring 2026, it was determined that the boardwalk could remain in service for 2026 with minor repairs, and it was opened for the summer season. The boardwalk will close for the winter season in mid-November 2026 and remain closed until fall 2027 when the new trail and staircase are scheduled for completion.
Starting in spring 2027, the boardwalk will be removed and a granular, ground-level trail will be constructed. The existing staircase at 142 Street will be replaced with a new wooden staircase that meets current City standards. This work is expected to be complete in fall 2027.
Pathways providing connectivity to adjacent neighbourhoods and parks will be maintained except for the 1 narrow trail connection from the boardwalks near the river at the bottom of the ravine leading up to Riverside Drive. This segment will be permanently closed in 2027 due to encroachment on private property and safety concerns caused by erosion and bank stability.
Indigenous Engagement
The MacKenzie Ravine features several mineral-rich natural water springs, which have significance to many Indigenous Nations. Partnership and engagement with the nations to understand knowledge, use, and importance of the area has informed the replacement trail design and protection of the ravine. Ceremony and participation will continue through the duration of the project.
Project Timeline
2027
- Trail and stair construction
- Temporary trail closure during construction.
- Mackenzie Ravine to Riverside Drive trail closure with naturalization of the trail end accesses
2026
- Minor boardwalk repair work
- Indigenous engagement
- Preliminary and detailed design
2025
- Indigenous engagement
- Concept and preliminary design
Project History
The City of Edmonton invited Indigenous groups to take part in a harvesting opportunity throughout the month of September before the existing trail is replaced. The purpose was to:
- Provide an opportunity to harvest within the MacKenzie Ravine
- Honour the land and the cultural practices connected to harvesting
- Continue to build respectful relationships between Indigenous community members and the City of Edmonton
The City is committed to reducing any cultural and spiritual harm by ensuring Indigenous Peoples have opportunities to harvest available medicines before construction begins.
This was an unhosted event. No staff were on site to assist with the harvesting.
The boardwalk, which runs east to west, was closed in November 2025 due to seasonal safety concerns. An inspection in April 2026 determined that the boardwalk could remain in service for 2026 with minor repairs, but would require renewal construction in 2027. The trail reopened to trail users in June, once these repairs were completed.