Main page content begins here

The City has identified priority arterial roads in need of rehabilitation and reconstruction.

63 Avenue, 99 Street to Calgary Trail

  • Condition rating: 0.1
  • The westbound lanes were completed in 2013 and the eastbound lanes are currently under construction. Completion is expected in late 2014.

63 Avenue (99St-104St) - Westbound Lanes

90 Avenue, 75 Street to 83 Street

  • Condition rating: 1.9
  • Scheduled for reconstruction in 2015

90 Avenue, 75 Street to 83 Street

142 Street, 118 Avenue to Yellowhead Trail

  • Condition rating: 2.1
  • Scheduled for reconstruction in 2015

142 Street, 118 Avenue to Yellowhead Trail

106 Avenue, 97 Street to 116 Street

  • Condition rating: 2.2
  • Not currently scheduled for renewal; work will be coordinated with proposed neighbourhood reconstruction in Queen Mary Park.

106 Avenue, 97 Street to 116 Street

111 Avenue, 163 Street to 170 Street

  • Condition rating: 2.2
  • Not currently scheduled for renewal; pothole repairs and patch paving will maintain safe condition until reconstruction can be scheduled.

111 Avenue, 163 Street to 170 Street

124 Street, 111 Avenue to 118 Avenue

  • Condition rating: 2.2
  • Scheduled for resurfacing in 2014

124 Street, 111 Avenue to 118 Avenue

18 Street, 153 Avenue to TUC (Transportation Utility Corridor)

  • Previous condition rating: 2.2
  • 18 Street, from 153 Ave to the TUC, was upgraded in 2014.

18 Street, 153 Avenue to TUC (Transportation Utility Corridor)

23 Avenue, 184 Street to 199 Street

  • Condition rating: 2.3
  • Not currently scheduled; existing roadway will be replaced by a new arterial road as part of the planned Riverview Area Structure Plan.

23 Avenue, 184 Street to 199 Street

178 Street, Callingwood Road to 69 Avenue

  • Condition rating: 2.5
  • Scheduled for resurfacing in 2012

178 Street, Callingwood oad to 69 Avenue

195 Avenue, Meridian Street to Manning Drive

  • Condition rating: 2.5
  • Not currently scheduled; existing roadway will be replaced by a new arterial road as part of a future Area Structure Plan.

195 Avenue, Meridian Street to Manning Drive

For More Information

Transportation Operations

Email transportationoperations@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content