Within the Concept Phase, all aspects of the project are developed and assessed. At this stage, the scope of the project is developed and concept plans are drawn up. This phase involves looking at all aspects of the project from the design and duration to the costing and overall impact to residents. Once the project plan has been completely developed, then a decision to go forward into the Design Phase will be made.

28 Avenue

28 Avenue SW: 170 Street to 182 Street

Concept

The extent of this project is to construct the first two urban lanes of 28 Avenue SW from 170 Street to 182 Street in order to accommodate growth and increased traffic flows from future developments.

Developer: Rohit Land Development
Consultant: WSP | MMM Group Ltd.

170 Street

170 Street: 25 Avenue SW to 19 Avenue SW

Concept

The extent of this project is to construct the first two lanes of 170 Street from 25 Avenue SW to 19 Avenue SW in order to accommodate growth and increased traffic flows from future developments.

Developer: Rohit Land Development
Consultant: WSP | MMM Group Ltd.

195 Avenue

195 Avenue: 50 Street to 65 Street

Concept

The extent of this project is to design the arterial road to its ultimate alignment.

Developer: Walton International Group
Consultant: CIMA+

215 Street

215 Street: Hope Road to 23 Avenue

Concept Plan Update

Developer: TBA
Consultant: Stantec Consulting Ltd.

Arterial C

Arterial C: Manning Drive to 18 Street NE

Concept Plan

Developer: TBA
Consultant: CIMA

Fort Road

Fort Road: Meridian Street to 18 Street NE

Concept Plan

Developer: TBA
Consultant: Invistec Consulting Ltd.

Lessard Road

Lessard Road: 199 Street to 215 Street

Concept

Developer: TBA
Consultant: Stantec Consulting Ltd.

Meridian Street

Meridian Street: 153 Avenue to 167 Avenue

Concept

The extent of this project is to construct the first two lanes of Meridian Street from 153 Avenue to 167 Avenue in order to accommodate growth and increased traffic flows from future developments.

Developer: Walton International Group
Consultant: CIMA+

Meridian Street: Manning Drive to Arterial B

Concept

Developer: TBA
Consultant: CIMA

For More Information

Subdivision & Development Coordination