About the Project

34 Street connects residential communities in southeast Edmonton to the industrial areas in Strathcona County and the City of Edmonton. With the potential for new industrial and commercial developments along this road, it is anticipated that the traffic volumes will increase.

Project Lifecycle - Concept Phase

A planning study is required to develop future plans for 34 Street from Baseline Road to Whitemud Drive to guide future upgrades from the existing two-lane undivided roadway to an ultimate multi-lane road.

The City of Edmonton and Strathcona County are collaborating to conduct the planning study.

Project History

Open House - March 6, 2013

On Wednesday, March 6, City representatives gave detailed information regarding the concept plan for the 34 Street Planning Study. Below are the links to the presentation materials as well as any information that was distributed and displayed.

Presentation

Concept Plan

Fact Sheet

For More Information

Natalie Lazurko

Transportation Planning

Title Project Manager
Telephone

780-442-4529

Email natalie.lazurko@edmonton.ca

Rob Gibbard

Title Director
Telephone 780-423-5280
Email rob.gibbard@edmonton.ca