What's New

Recommended concept plan for 107 Avenue, 130 Street to 170 Street now available for review online:

107 Avenue - 130 Street–170 Street

About the Project

107 Avenue is one of Edmonton’s major east-west corridors serving both residential communities and commercial districts from Downtown to the City’s west side. It is a designated truck route and may experience future traffic flow changes with the addition of the Valley Line LRT along 102 Avenue/ Stony Plain Road. The City is conducting a long-range concept planning study to improve current and future traffic patterns and to accommodate growth.

The concept planning study will look at intersection improvements, potential road widening and roadway upgrades. The goal is to improve safety and traffic flow efficiency for all road users along 107 Avenue.

Project Timeline

Project Lifecycle Concept

2024: Operate
Construction will be completed. The area will be fully open for use in its new form.

2021–2023: Build 
Construction will start in 2021, beginning with roadway network changes off Yellowhead Trail.

2020: Detailed Design    
Refine the preliminary design and prepare plans and specifications that will guide construction and ensure that changes are built to standards.

2020: Preliminary Design
Develop the concept plan in more detail, determine issues and constraints and how those can be managed. Prepare schedule and budget.  

2018–2019: Concept    
Developing a plan for what will be built and what it will look like including changes to the broader roadway network.

2011: Strategy    
The Yellowhead Strategic Plan directed the closure of access to and over Yellowhead Trail at 66 Street.

What's Next

This study was initiated in late spring 2013. A public survey / questionnaire was launched in mid-August 2013 to gather feedback. In September 2013, the project team conducted interviews with representatives from area community leagues and business groups. Various technical studies and transportation model updates were conducted between December 2013 and August 2014, followed by analysis and implementation of the results.

In November 2014, the project was divided into two sections. The corridor east of 130 Street is currently on hold, while a draft concept plan of the corridor west of 130 Street was shared with the public at an Open House in early 2015.

Please refer to each section’s project page for more information on next steps.

To date, no funding has been made available for the upgrades to 107 Avenue, so there is no timeline for construction.

Project History

Project Update - January 2015

The project team reorganized the 107 Avenue concept planning project and have advanced one section of the project to the next stage of development.

The fall 2013 online survey and interviews with community stakeholders revealed a split in traffic concerns for the corridor. Citizens east of 130 Street had concerns with on-street parking, neighbourhood parking and unsignalized pedestrian crossings. This section of the roadway is very narrow, with businesses abutting the street; additional analysis will better determine the required improvements to this corridor.

West of 130 Street there is no on-street parking; instead, issues related to traffic delays, congestion, and concerns with pedestrian/ cycling connections and safety were identified by the public as major concerns.

Following the survey, the project team undertook significant traffic analysis of the entire corridor, considering updates to population and employment projections, land use plans and future traffic changes as a result of the planned Valley Line LRT. The analysis included a review of the number of lanes required, pedestrian and cyclist accommodation, and looked at the advantages and disadvantages of widening the corridor. As a result of this analysis and the divergent nature of the public’s concerns, the project has been divided into two sections.

109 Street to 130 Street

107 Avenue (109 Street – 130 Street)

130 Street to 170 Street

107 Avenue (130 Street – 170 Street)

For More Information

107 Avenue Planning Study

Telephone

780-496-2407

Email 107avenue@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content