Main page content begins here

About the Project

Construction included:

  • The installation of a concrete pile retaining wall at the existing timber boardwalk location
  • Replacement of the existing timber boardwalk with an improved, wider walkway

Local traffic access was maintained for the duration of the construction via alternate routes.

Saskatchwan Drive Detour and Construction Map

June 2013 - Construction Update

  • On June 1, the eastbound lane of Saskatchewan Drive was opened to traffic and will remain open throughout the construction. The westbound lane is permanently closed and will not be re-opened until the project is complete.
  • The re-opening of Saskatchewan Drive in both directions is still expected for early August however it will be weather-dependent.

March 6, 2013 - Public Information Meeting

The meeting gave participants an opportunity to learn more about construction, pedestrian detours and traffic impacts.

The City is planning to construct a retaining wall along Saskatchewan Drive between 101 Street and 90 Avenue in order to stabilize the slope and preserve the integrity of both the road and multi-use pathway in the area.

Meeting Material

Display Boards

For More Information

Parks and Roads Services

‚Äč16th Floor Edmonton Tower
10111 - 104 Avenue NW
Edmonton, AB
T5J 0J4

Telephone 311
Fax 780-495-0330
Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content