About the Project

108 Street from 99 Avenue to 104 Avenue has been upgraded with a streetscape component to enhance Capital Boulevard and to signify and celebrate this ceremonial street.

Construction Included:

  • Reconstruction of all new curb, gutter, sidewalks and road base
  • Decorative lights and signal lights
  • V-Gutters to enhance pedestrian movement
  • Paving stone road surface
  • Granite pavers and bollards
  • Raised mid-block planters and benches
  • Addition of pedestrian level and replacement of street lighting

The project included roadway rehabilitation on 99 Avenue from 104 Street to 109 Street.

Repairs were made to the sidewalks, curbs and gutters and an asphalt overlay was applied to the road.

Timeline

Construction began in June 2011 and the project was completed in the fall of 2014.

For More Information

Gordon Mitchell

Telephone

780-944-5662

Email gordon.mitchell@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content