Main page content begins here

View in the Open Data Catalogue

A map viewing showing the locations of completed road projects.

50 St Overpass
Over Sherwood Park Fwy

Completed: 2016

The 50 Street Bridge over Sherwood Park Freeway was rehabilitated in order to remain serviceable for the next 10-15 years until future modifications or replacement occurs.

53 Avenue Overpass
Over Whitemud Drive

Completed: 2016

The 53 Avenue Overpass over Whitemud Drive underwent maintenance and rehabilitation to keep it in a safe, functional condition for many more years.

102 Avenue Bridge
Over Groat Road

Completed: 2016

The 102 Avenue over Groat Road Bridge was demolished and replaced with a new bridge that maintains the existing four-lane configuration. It also features a cycle track on the north side of the bridge between the sidewalk and outside travel lane and sidewalks along the north and south sides.

127 Street Reconstruction
118 Avenue to Yellowhead Tr

Completed: 2016

127 Street from 118 Avenue to Yellowhead Trail underwent road reconstruction, which included the complete removal and replacement of the four-lane roadway, as well as the renewal of streetlights, curb and gutter and sidewalks.

195 Avenue Reconstruction
17 Street to Horse Hills Creek

Completed: 2016

The City completely reconstructed 195 Avenue between 17 Street NE and Horse Hills Creek to meet the City's rural roadway standards. This work included wider lanes and shoulders, access replacement and minor ditch regrading.

Buena Vista Road

Completed: 2016

Buena Vista Road improvements included a new traffic circle at the end of Buena Vista Road near the zoo, removal and replacement of the road, curb and gutter and sidewalks, installation of raised crosswalks and intersection improvements.

Central LRT Station & Jasper Avenue Streetscape

Completed: 2013

This project included repairs to Central LRT Station and a new streetscape along Jasper Avenue between 100 Street and 102 Street. The new streetscaping elements are based on the Jasper Avenue New Vision.

Ewing Trail SW / 91 Street SW
30 Avenue SW to 41 Avenue SW

Completed: 2016

The Ewing Trail SW (91 Street SW) project included construction of a new three-lane arterial road that connects to Leduc County’s Range Road 244 and to the QEII/41 Avenue SW interchange. The new road and associated utilities will accommodate future growth in the area.

Whitemud Drive Widening
75 Street/66 Street to 17 Street

Completed: 2016

Whitemud Drive was widened to six lanes from 75 Street/66 Street to 17 Street with an auxiliary lane between the 66 Street and 50 Street ramps. The added lanes were constructed over the existing grassed median and a concrete median barrier was added.

For More Information

311 Contact Centre

Online Contact 311 Online
Telephone

In Edmonton: 311
Outside Edmonton: 780-442-5311

TTY 780-944-5555
Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content