About the Project

41 Avenue SW will be upgraded to accommodate growth and increased traffic flows in the area. The existing roadway will be removed and replaced with two urban lanes. These new northern lanes will be aligned to allow for future development of additional lanes to the south, with the ultimate goal being a six lane arterial roadway. Construction of the first two lanes will be completed in 2017.

Temporary Road Closure Notification

Road Closure and Traffic Accommodation - Desrochers Drive to James Mowatt Trail

Road Closure and Traffic Coordination

41 Avenue SW - Chappelle Way to Desrochers Drive

Construction 2017

The extent of this project is to construct two urban lanes and remove the existing lanes. The road will be fully closed to traffic from April 17, 2017 until October 31, 2017. Access for local residents will be maintained.

Developer Engineer

Delcon Creekwood Master GP Ltd.

Al-Terra Engineering Ltd.
Brad Crossland
Project Engineer
780-440-4411

41 Avenue SW - Desrochers Drive to James Mowatt Trail

Construction 2017

The extent of this project is to construct two urban lanes and remove existing lanes. The road will be fully closed to traffic from April 17, 2017 until October 31, 2017. Access for local residents will be maintained.

Developer Engineer

MLC Group

Dave Iwaskow, Construction Manager
780-401-2247

Stantec Consulting Ltd.

Tariq Mahmood, Principal
Project Engineer
780-917-1899

Scott Gilroy, Site Engineer
780-995-2997

For More Information

311

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

TTY 780-944-5555 and press 0
Email 311@edmonton.ca