Project Update - November 2017

The construction on 41 Avenue is complete; however 141 Street is still closed to traffic. A temporary connection for 141 Street north of 41 Avenue has been constructed but 141 Street requires street lighting and line painting to be installed before it can be opened to the public. The tentative schedule to open 141 Street is mid-December 2017.

About the Project

41 Avenue SW has been upgraded to accommodate growth and increased traffic flows in the area. The existing roadway was removed and replaced with two urban lanes. These new northern lanes were aligned to allow for future development of additional lanes to the south, with the ultimate goal being a six lane arterial roadway. Construction of the first two lanes was completed in 2017.

41 Avenue SW - Chappelle Way to Desrochers Drive

Completed 2017

The extent of this project was to construct two urban lanes and remove the existing lanes.

Developer Engineer

Delcon Creekwood Master GP Ltd.

Al-Terra Engineering Ltd.
Brad Crossland
Project Engineer
780-440-4411

41 Avenue SW - Desrochers Drive to James Mowatt Trail

Completed 2017

The extent of this project was to construct two urban lanes and remove existing lanes.

Developer Engineer

MLC Group

Dave Iwaskow, Construction Manager
780-401-2247

Stantec Consulting Ltd.

Tariq Mahmood, Principal
Project Engineer
780-917-1899

Scott Gilroy, Site Engineer
780-995-2997

For More Information

311

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

TTY 780-944-5555 and press 0
Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content