122 Street will undergo reconstruction in 2 separate projects from 51 Avenue to Fox Drive then from Whitemud Drive to 51 Avenue.

51 Avenue - Fox Drive

Project Update - January 2019

All road works were completed in 2018. Sod installation and landscaping are scheduled for completion in May 2019. 

Traffic will be down to 1 lane in each direction from 63 Avenue to 51 Avenue during this work so travel delays should be expected.

About this Project

Reconstruction began in June 2018 on 122 Street, north of 51 Avenue to Fox Drive. A portion of this area, the 63 Avenue intersection, was recently reconstructed and was left as is. The work included reconstruction of the road and replacing the sidewalk on the west side with a 3-metre wide shared-use path.

The work was carried out 1 side at a time, traffic was reduced to 1 lane in each direction from early June until November 2018.

Whitemud Drive — 51 Avenue

About this Project

Reconstruction is expected to begin in May 2019 on 122 Street from Whitemud Drive to 51 Avenue. The work includes reconstruction of the roadway, replacement of curb and gutter, a Shared Use Path, resurfacing of the on and off ramps for Westbound Whitemud Drive and the replacement of signals at the intersection of 51 Avenue and Whitemud Drive. 

Traffic will be down to 1 lane in each direction during the construction so travel delays should be expected.

Project Timeline

Construction scheduled to begin in May 2019 and is expected to be complete in November 2019.
 

For More Information

Jason Woo

Telephone

780-423-5545

Email jason.woo@edmonton.ca