In 2019, 122 Street underwent reconstruction in 2 separate projects from 51 Avenue to Fox Drive then from Whitemud Drive to 51 Avenue.

51 Avenue - Fox Drive

About this Project

Reconstruction began in June 2018 on 122 Street, north of 51 Avenue to Fox Drive. A portion of this area, the 63 Avenue intersection, was recently reconstructed and was left as is. The work included reconstruction of the road and replacing the sidewalk on the west side with a 3-metre wide shared-use path.

Project Timeline

All road works were completed in 2018. Sod installation and landscaping were completed in May 2019. 

Whitemud Drive — 51 Avenue

About this Project

The work included reconstruction of the roadway, replacement of curb and gutter, a Shared Use Path, resurfacing of the on and off ramps for Westbound Whitemud Drive and the replacement of signals at the intersection of 51 Avenue and Whitemud Drive. 

Project Timeline

Construction began in May 2019 and was completed in early November 2019.
 

For More Information

Jason Woo

Telephone

780-423-5545

Email jason.woo@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content