Where We Are

Phase 2 - Preliminary Design Review

The 2013 preliminary design is being refreshed. The refresh will look at the remaining portion of 105 Avenue, from 97 Street to 116 Street, with an emphasis on protected bike lanes. This also includes drainage upgrades.

Project History

2016: Construction Complete

Project Lifecycle Operate

The City completed Phase 1 streetscape improvements from 116 Street to 119 Street, to help make 105 Avenue more accessible and pedestrian-friendly. This construction was based on the 2013 preliminary design focused on 105 Avenue between 109 Street and 119 Street.

April 28, 2015: Pre-construction Meeting

Project Lifecycle Build

The City of Edmonton held an open house about the reconstruction and streetscaping of 105 Avenue, between 119 Street and 116 Street. The open house was an informal, drop-in event with visual displays and opportunities for the public to ask have their questions answered. 

Presentation and Display Boards (12 MB)

January 21, 2014: Open House

Project Lifecycle Design

The City held an open house on Tuesday, January 21 to present plans for the 105 Avenue Streetscape to the public.

Presentation

Display Boards

Design Plan - 109 Street-119 Street

Frequently Asked Questions

105 Avenue (Columbia Avenue) Preliminary Design

November 27, 2013: Stakeholder Meeting

Project Lifecycle Design

The project team held a stakeholder meeting on November 27 at MacEwan University to get feedback on the final design plans from area stakeholders.

Display Boards

EPCOR Power Infrastructure

For More Information

Linda Billey

Telephone

780-496-3530

Email linda.billey@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content