Project Timeline

Project Management Timeline Image Build Phase

2020

Anticipated completion of Valley Line LRT

2018

Anticipated completion of replacement storage building

2016

  • Geotechnical and soil testing
  • Risk management plan for construction
  • Environmental review and approval
  • Begin construction of replacement storage building

2015

  • Valley Line LRT Environmental Impact Screening Assessment update approved by City Council
  • Replacement storage building design complete

2014

  • Design of the replacement storage building begins
  • Geotechnical and soil testing

2013

Valley Line LRT Environmental Impact Screening Assessment approved by City Council

Project Overview

The existing Muttart Conservatory storage building, located south of the conservatory greenhouses, must be demolished to allow for the construction of the Valley Line LRT.

When determining a location for the new storage building, the City considered  how best to accommodate a like-for-like storage building, associated parking, and delivery truck access requirements to meet the delivery needs of the Muttart Conservatory greenhouses.

The final building location was shifted to the southwest so as not to affect a future park access road and shared-use path between the greenhouses and the storage building.

The site footprint was reduced from 4340 m2 at the existing site to 2595 m2. The outdoor parking/loading/turnaround area is 860 m2, smaller than the original 1490 m2 lot.

Photo Gallery

For More Information

Integrated Infrastructure Services

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content