The community of Jackson Heights has several access paths into the Mill Creek Ravine. Near the intersection of 42 Avenue and 46 Street, a granular path leads to a wooden staircase into the ravine. Due to the steep grade, water runs down the granular path when it rains, carrying gravel onto the staircase and creating a slip hazard.

Project Objectives 

  • Replace stairs and extend the stairs to the top of bank to meet the current City standards
  • Install benches, if required (to be decided during concept planning)
  • Improve safety for users
  • Follow recommended maximum number of steps between landings, with no more than 2 flights of stairs before a change of direction
  • Tie into the existing granular trail at bottom of stairs 
  • Tie into either the existing granular trail or concrete walkway at the top of the bank
  • Include consideration for erosion control within proximity of the stairs and beneath stairs

Information Session

A public engagement session was held at the Burnewood Community League Hall on Wednesday April 3, 2019.

Project Timeline

2019/2020: Construction estimated to begin in summer and be completed by spring

2019: Detailed design finalized, public information sessions and completion of environmental information assessment

For More Information

Open Space Planning and Design

14th Floor, Edmonton Tower
10111 - 104 Avenue NW
Edmonton, AB T5J 0J4

Telephone

In Edmonton: 311
Outside Edmonton: 780-442-5311

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content