2019: Construction began in the spring and was completed in September
2017 and 2018: Detailed design and public information activities
2016: Public information activities and completion of the environmental impact assessment
New mandatory public health measures are in effect across Alberta to protect the health system and slow the spread of COVID-19. Learn more at edmonton.ca/COVID-19.
Main page content begins here
The Highlands river valley stairs are now complete.
The Highlands Granular Trail project was first identified in December 2009. The Highlands Trail is located on the west side of the Capilano Bridge and north of the North Saskatchewan River. The trail that leads to the lower trails is steep. Users of the trail have difficulty traversing the trail due to the grade and the lack of handrails. Several goat paths have also developed in this region as users have sought alternative approaches to reach the lower trails. As well, due to the slope and lack of stockpile space, maintenance equipment is unable to easily maintain the trail.
2019: Construction began in the spring and was completed in September
2017 and 2018: Detailed design and public information activities
2016: Public information activities and completion of the environmental impact assessment
14th Floor, Edmonton Tower
10111 - 104 Avenue NW
Edmonton, AB T5J 0J4
Telephone | In Edmonton: 311 |
---|
End of page content. Please choose between the following five options:
Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content