Main page content begins here

Eastglen Leisure Centre has been a neighbourhood gem since its construction in the early 1960s. It is nestled in the charming Bellevue Community along 68 street and 114 avenue. During the facility’s first renovation in the mid 1980s, a steam room and hot tub were added. Eastglen was one of the first pools in the City to convert from a chlorine disinfection system to a salt water system in the early 1990s. Since then it has undergone several renovations to ensure that it remains a vibrant community facility.

Project Timeline

Eastglen Leisure Centre Master Plan Project Timeline Image

Spring 2017 - Completion of the master plan based on public and stakeholder feedback.

Spring 2017 - Community Engagement Event #2. Public and stakeholder consultation to share draft master plan.

Open house display board

February 2017 - Community Engagement Event #1. Public and stakeholder consultation to identify program and emerging needs to inform the master plan.

What we heard summary report

December 2016 - Consultant hired to complete the master plan.

Summer 2015 - Consultation with public to understand the needs of users and solutions to optimize use of the facility.

The Design and Build phases are dependent on future funding.

Project Overview

Public consultation was completed in 2015 to help the City understand what role the Eastglen facility plays in the daily life of the community and its users, to understand the needs of Eastglen users and find collaborative solutions to optimize use of the facility. The summary report can be read in the Community Consultation Summary Report.

As a result of the feedback, a functional program is underway to define the functions and space improvements for consideration in future renewals for Eastglen Leisure Centre. A functional program will provide the City with a clear understanding of the functional criteria and physical improvements to be achieved in the design of the facility and its amenities. The functional program will ensure that Eastglen Leisure Centre continues to serve the recreational needs of Edmontonians by ensuring the facility remains functional and accessible.

For More Information

Integrated Infrastructure Services

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content