Main page content begins here

A sprawling network of over 4900 km of storm and sanitary sewer pipes, built, maintained and operated by the EPCOR, transports all wastewater to the Gold Bar Wastewater Treatment Plant (GBWWTP) for processing. For the system to run smoothly, everything from your drain to the pipes that connect to GBWWTP must be working properly.

Most information about this utility is now being managed by EPCOR.  

 About the Drainage System

For More Information

311 Contact Centre

Online Contact 311 Online
Telephone

In Edmonton: 311
Outside Edmonton: 780-442-5311

TTY 780-944-5555
Email 311@edmonton.ca

End of page content. Please choose between the following five options:

Back to main menu Back to current page menu and content View current page breadcrumb Back to site search Continue to page footer content