Current Rates
For New Development
- Residential - Premise with one or two dwellings where it does not have a secondary suite or garden suite: $1,629/dwelling
- Residential - Premise with two dwellings where one dwelling is a secondary suite or garden suite: $1,629 for the principal dwelling, and $721 for the secondary suite or garden suite
- Residential - Premise with three or more dwellings: $1,163/dwelling
- Commercial/Industrial/Institutional: $8,148/hectare
For Redevelopment/Expansion (Residential, Commercial, Industrial, or Institutional)
Charges are calculated by the equation A minus B, where:
A = the Sanitary Sewer Trunk Charge that should be paid by the new development based on the rate applicable to that particular development.
B = charge paid, or would have been paid, by existing development on the site.
If A minus B results in zero or negative amount, no payment or refund is applicable.
Illustrative Example
For a new 15 suite apartment built on the sites of 3 existing single family residential houses
New dwelling units (15): $1,163 x 15 = |
$17,445 (A) |
Demolished dwelling units (3): $1,629 x 3 = |
$4,887 (B) |
SSTC charge = |
$12,558 (A-B) |
Note: SSTC charges applicable to each development permit will be confirmed by the Development Officer at time of application.
Charges for past years are listed in the Historical Rates sheet.