Development, upgrades and improvements to Edmonton public transportation.

Edmontonians will begin to see more development, upgrades and improvements to Edmonton public transportation beginning in May, 2017 thanks to the Public Transit Infrastructure Fund (PTIF).

This fund holds approximately $300 million and is made of contributions from the Government of Canada, Government of Alberta and the City of Edmonton. It has allowed the City of Edmonton to put forward 46 infrastructure projects across Edmonton to improve the user experience when using Edmonton Transit Services and LRT.

Transit Centre Improvements

Belvedere Transit Centre

The Belvedere Transit Centre (6120-129 Avenue) is a heated building on the east side of the bus lanes, where transit riders wait for the bus. The existing building will be demolished and a new building will be constructed in the same area. The existing building will be replaced with a new, larger building with improved amenities and viewing area.

Construction is scheduled to begin in Fall 2017.

View images of the future transit centre.

Capilano

Replacement of the Capilano busway.

Construction timelines to be determined.

Century Park

LED lighting upgrade planned for Fall 2017.

Clareview East

LED lighting upgrade planned for Fall 2017.

Clareview West

LED lighting upgrade planned for Fall 2017.

Eaux Claires

LED lighting upgrade planned for Fall 2017.

Jasper Place Transit Centre

Jasper Place Transit Centre is getting a new look.  The existing bus shelter will be demolished and a heated waiting areas will be constructed on a wider platform.  The new waiting areas will accommodate more people more comfortably than the old shelter.  The old brick building on the northwest corner of the transit centre will be demolished and a new, smaller operations building will take its place with some landscaping, bike parking and seating.  Take a look at renderings of the new Jasper Place Transit Centre.

Construction started in July, 2017 and is expected to be in operation in the summer 2018.

View images of the future transit centre.

 

Leger

LED lighting upgrade planned for Fall 2017.

Lewis Farms

LED lighting upgrade planned for Fall 2017.

Meadows

LED lighting upgrade planned for Fall 2017.

Northgate

Replacement of the Northgate busway scheduled to begin in Spring 2017.

South Campus/Fort Edmonton Park

LED lighting upgrade planned for Fall 2017.

Southgate

LED lighting upgrade planned for Fall 2017.

Westmount

Replacement of the Westmount busway scheduled to begin in Spring 2017.

LRT Station Improvements

Coliseum

Coliseum LRT Station Refurbishment (Design only)

Planning and design for refurbishment of the Coliseum LRT Station and Transit Centre includes:

  • Design elements that increase safety and connectivity
  • Replace and repair outdated or damaged areas
  • Improve access, flow and accessibility to ensure the LRT station and transit centre are connected, allowing people to move safely and efficiently
  • Ensure the new design and components within the refurbished station are efficient to operate and maintain long-term
  • Incorporate land-use integration with the Coliseum Station Area Redevelopment Plan (ARP) which is currently under development

A schematic design for refurbishment of the existing Coliseum LRT Station and Transit Centre will be complete in spring 2018.

Note: Construction for this project is not yet funded. The City will bring forward the completed schematic design plans to request funding required for the final detailed design and construction. A timeline for construction has not been set.

 

Stadium

Stadium LRT Station Refurbishment (Design only)

Planning and design for refurbishment of the Stadium LRT Station includes:

  • Design elements that increase safety and connectivity
  • Improve access, flow and accessibility to ensure the LRT station and transit centre are connected, allowing people to move safely and efficiently
  • Ensure the new design and components within the refurbished station are efficient to operate and maintain long-term
  • Replace and repair outdated or damaged areas in the existing station. Please note that possible relocation of the Stadium LRT Station is not included in this refurbishment project
  • Incorporate land-use integration with the Stadium Station Area Redevelopment Plan (ARP) which is currently under development

A schematic design for the refurbishment of Stadium LRT Station will be complete in spring 2018.

Note: Construction for this project is not yet funded. The City will bring forward the completed schematic design plans to request funding required for the final detailed design and construction. A timeline for construction has not been set.

Images of the Future Transit Centre

For More Information

Office of Infrastructure & Funding Strategy

5th Floor, Chancery Hall
3 Sir Winston Churchill Square
Edmonton, AB
T5J 2C3

Telephone 780-496-5304
Fax 780-420-4884
Email infrastructure@edmonton.ca