About the Project
Construction impacts:
- The installation of a concrete pile retaining wall at the existing timber boardwalk location
- Replacement of the existing timber boardwalk with an improved, wider walkway
Local traffic access was maintained for the duration of the construction via alternate routes.

![]()
Project History
June 2013 - Construction Update
- On June 1, the eastbound lane of Saskatchewan Drive was opened to traffic and will remain open throughout the construction. The westbound lane is permanently closed and will not be re-opened until the project is complete.
- The re-opening of Saskatchewan Drive in both directions is still expected for early August however it will be weather-dependent.
March 6, 2013 - Public Information Meeting
The meeting gave participants an opportunity to learn more about construction, pedestrian detours and traffic impacts.
The City is planning to construct a retaining wall along Saskatchewan Drive between 101 Street and 90 Avenue in order to stabilize the slope and preserve the integrity of both the road and multi-use pathway in the area.
Meeting Material
Display Boards
For More Information
Transportation Operations
15th Floor, Century Place
9803 - 102A Avenue
Edmonton Alberta
T5J 3A3
| Telephone | 311 |
|---|---|
| Fax | 780-496-1757 |
| transportationoperations@edmonton.ca |