Design Phase - Developer Arterial Projects
The Design Phase is important to finalize all of the strategies developed in the Concept Phase. All design details and construction methods are defined and identified and a project plan is finalized for approval.
23 Avenue
23 Avenue: 17 Street to Tamarack Collector
Detailed DesignThe extent of this road construction is to construct 2 urbanized lanes of 23 Avenue from 17 Street to Tamarack Collector to accommodate growth and increased traffic flows from future subdivision developments.
This project is anticipated to be completed in December 2015.
| Developer | Engineer |
|---|---|
|
Qualico |
Stantec Inc. Don Hall 780-917-7213 |
41 Avenue
41 Avenue: Heritage Valley Trail to Chappelle Collector
Preliminary DesignThe extent of this project is to construct the first two lanes of 41 Avenue, from Heritage Valley Trail to the collector road in Chappelle, in order to accommodate growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Sherrick Management Ltd. |
Al-Terra Engineering Ltd. |
41 Avenue: James Mowatt Trail to Heritage Valley Trail
Preliminary DesignThe extent of this project is to construct first two lanes of 41 Avenue from James Mowatt Trail to Heritage Valley Trail in order to accommodate growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
MLC |
Stantec |
66 Street
66 Street: S/178 Avenue to TUC
Detailed DesignThe extent of this project is to construct right and left turn bays along 66 Street at the intersection with future 178 Avenue (Crystallina Nera ). This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Maclab |
Stantec |
66 Street: At Crystallina Nera Drive
Detailed DesignConstruction of northbound left and southbound right turn bays along 66 Street at the intersection with Crystallina Nera Drive. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Genstar |
Select Engineering |
92 Avenue
92 Avenue: 215 Street to 231 Street
Detailed DesignThe extent of this project is to construct the ultimate roadway from 215 Street to 231 Street including roundabouts at each intersection. This project is anticipated to start in 2017 with some staging required.
| Developer | Engineer |
|---|---|
|
MLC |
Al-Terra |
170 Street
170 Street: 19 Avenue SW to Hiller Road
Detailed DesignThe extent of this project is to construct first two lanes of 170 Street from 19 Avenue to Hiller Road in order to accommodate the growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
tba |
Stantec |
170 Street: 137 Avenue to 139 Avenue
Detailed DesignThe extent of this project is to construct a right turn bay and access to a commercial site on 170 Street between 137 Avenue and 139 Avenue. This project is anticipated to be completed in the 2015 construction season.
| Developer | Engineer |
|---|---|
|
Qualico |
IBI Group |
231 Street
231 Street: Secord Gate to S/97 Avenue
Detailed DesignThe extent of this project is to construct the first 2 lanes of 231 Street from Stony Plain Road to the Secord neighbourhood collector road to accommodate growth and increased traffic flows from future subdivision developments.
This project is anticipated to be completed in the 2015 construction season.
| Developer | Engineer |
|---|---|
|
Hopewell Development |
Stantec Inc. |
231 Street: Stony Plain Road to S/97 Avenue
Detailed Design Review ProcessThe extent of this road construction is to construct the first 2 lanes of 231 Street from Stony Plain Road to the Secord neighbourhood collector road to accommodate growth and increased traffic flows from future subdivision developments.
This project is anticipated to be completed in the 2015 construction season.
| Developer | Engineer |
|---|---|
|
Walton International Group |
Stantec Inc. |
Ellerslie Road
Ellerslie Road : Eco Station to Whitemud Creek
Detailed DesignThe extent of this project is to construct the first two lanes of Ellerslie Road from Whitemud Creek to the access to the Eco Station. This project is anticipate to be completed in the 2017 construction season.
| Developer | Engineer |
|---|---|
|
Sherrick |
Stantec |
Heritage Valley Trail
Heritage Valley Trail: 28 Avenue to Paisley Gates
Preliminary DesignThe extent of this project is to construct the first two lanes of Heritage Valley Trail from 28 Avenue to Paisley Gates to accommodate the growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Brookfield |
Stantec |
Heritage Valley Trail: 41 Ave SW to 141 Street Collector
Detailed DesignThe extent of this project is to construct the first 2 lanes of Heritage Valley Trail from 41 Avenue SW to the 141 Street collector road to accommodate growth and increased traffic flows from future subdivision developments. This project is anticipated to be completed in the 2015 construction season.
| Developer | Engineer |
|---|---|
|
Sherrick |
IBI Group |
Hiller Road
Hiller Road: 175 Street to 178 Street
Preliminary DesignThe extent of this project is to construct first two lanes of Hiller Road from 175 Street to 178 Street in order to accommodate the growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Beaverbrook Developments |
IBI Group |
Hiller Road: 178 Street to 182 Street
Detailed DesignThe extent of this project is to construct the first two lanes of Hiller Road, from 178 Street to 182 Street, in order to accommodate the growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
tba |
IBI Group |
Lessard Road
Lessard Road: 202 Street to West Collector
Detailed DesignThe extent of this project is to construct first two lanes of Lessard Road from 202 Street to the west collector in order to accommodate the growth and increased traffic flows from future developments. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Qualico |
Stantec |
Mark Messier Trail
Mark Messier Trail: 137 Avenue to 143 Avenue
Detailed DesignThe extent of this project is to construct a right turn bay and median work at the intersection with future 148 Street. This project is anticipated to be completed in the 2016 construction season.
| Developer | Engineer |
|---|---|
|
Delcon |
Al-Terra |
For More Information
Development Planning & Engineering - Construction
Transportation Planning
City of Edmonton
| DeveloperArterials@edmonton.ca |