Concept Phase - Developer Arterial Projects
Within the Concept Phase, all aspects of the project are developed and assessed. At this stage, the scope of the project is developed and concept plans are drawn up. This phase involves looking at all aspects of the project from the design and duration to the costing and overall impact to residents. Once the project plan has been completely developed, then a decision to go forward into the Design Phase will be made.
170 Street
170 Street: 25 Avenue to 19 Avenue SW
ConceptThe extent of this project is to construct the first two lanes of 170 Street from 25 Avenue to 19 Avenue SW in order to accommodate growth and increased traffic flows from future developments
| Developer | Engineer |
|---|---|
|
Rohit |
MMM Group |
Meridian Street
Meridian Street: 153 Avenue to 167 Avenue
Concept StageThe extent of this project is to construct the first two lanes of Meridian Street, from 153 Avenue to 167 Avenue in order to accommodate growth and increased traffic flows from future developments.
| Developer | Engineer |
|---|---|
|
Walton International Group |
CIMA + |