Popular Searches
  • Big Bin Events
  • Eco Stations
  • Edmonton Maps
  • Pay Tickets
  • Permits
  • Spray Parks
  • Street Cleaning

Contact Us Visiting?

Arterial Roads

Priority Roads for Rehabilitation & Reconstruction

  1. 63 Avenue, 99 Street to Calgary Trail
  2. 90 Avenue, 75 Street to 83 Street
  3. 142 Street, 118 Avenue to Yellowhead Trail
  4. 106 Avenue, 97 Street to 116 Street
  5. 111 Avenue, 163 Street to 170 Street
  6. 124 Street, 111 Avenue to 118 Avenue
  7. 18 Street, 153 Avenue to TUC
  8. 23 Avenue, 184 Street to 199 Street
  9. 178 Street, Callingwood Road to 69 Avenue
  10. 195 Avenue, Meridian Street to Manning Drive

63 Avenue, 99 Street to Calgary Trail

  • Condition rating: 0.1
  • The westbound lanes were completed in 2013 and the eastbound lanes are currently under construction. Completion is expected in late 2014.

63 Avenue (99St-104St) - Westbound Lanes

90 Avenue, 75 Street to 83 Street

  • Condition rating: 1.9
  • Scheduled for reconstruction in 2015

90 Avenue, 75 Street to 83 Street

142 Street, 118 Avenue to Yellowhead Trail

  • Condition rating: 2.1
  • Scheduled for reconstruction in 2015

142 Street, 118 Avenue to Yellowhead Trail

106 Avenue, 97 Street to 116 Street

  • Condition rating: 2.2
  • Not currently scheduled for renewal; work will be coordinated with proposed neighbourhood reconstruction in Queen Mary Park.

106 Avenue, 97 Street to 116 Street

111 Avenue, 163 Street to 170 Street

  • Condition rating: 2.2
  • Not currently scheduled for renewal; pothole repairs and patch paving will maintain safe condition until reconstruction can be scheduled.

111 Avenue, 163 Street to 170 Street

124 Street, 111 Avenue to 118 Avenue

  • Condition rating: 2.2
  • Scheduled for resurfacing in 2014

124 Street, 111 Avenue to 118 Avenue

18 Street, 153 Avenue to TUC (Transportation Utility Corridor)

  • Previous condition rating: 2.2
  • 18 Street, from 153 Ave to the TUC, was upgraded in 2014.

18 Street, 153 Avenue to TUC (Transportation Utility Corridor)

23 Avenue, 184 Street to 199 Street

  • Condition rating: 2.3
  • Not currently scheduled; existing roadway will be replaced by a new arterial road as part of the planned Riverview Area Structure Plan.

23 Avenue, 184 Street to 199 Street

178 Street, Callingwood Road to 69 Avenue

  • Condition rating: 2.5
  • Scheduled for resurfacing in 2012

178 Street, Callingwood oad to 69 Avenue

195 Avenue, Meridian Street to Manning Drive

  • Condition rating: 2.5
  • Not currently scheduled; existing roadway will be replaced by a new arterial road as part of a future Area Structure Plan.

195 Avenue, Meridian Street to Manning Drive

For More Information

Transportation Operations

Email transportationoperations@edmonton.ca