Ward 3 - Construction On Your Streets
2013
Powered by SocrataRoad Construction Projects In Other Wards
| L03 | Street Light | 144 Avenue: 66 St. - 82 St. |
| N03 | Neighbourhood Overlay | Lago Lindo Neighbourhood |
| N23 | Northeast Road Replacement | Ozerna Road Replacement |
| P10 | Pavement Renewal | 153 Avenue WBD: 97 St. - Castle Downs Rd. |
| P11 | Pavement Renewal | Klarvatten Road: 91 St. - 170A Ave. |
| P12 | Pavement Renewal | 88 Street: 153 Ave - 160 Ave / 156 Avenue: 84 St - 88 St |
| S14 | Pedestrain/Bus Actuated Signals | 153 Avenue - Griesbach Road |
| The following projects are not located within Ward 3 however they may have an effect on residents in the area. | ||
|---|---|---|
| N24 | Northeast Road Replacement | Matt Berry Road Replacement |
| P06 | Pavement Renewal | 129 Street: 155 Ave. - 162 Ave. / 158 Avenue: 127 St. - 129 St. |
| P10 | Pavement Renewal | 153 Avenue WBD: 97 St. - Castle Downs Rd. |
| P29 | Pavement Renewal | 87 Street: 137 Ave. - 140 Ave. |
| S08 | Full Signals | Griesbach Parade Road - 97 Street |
Construction Types:
| B - Bridge Construction/ Rehabilitation | Bridge construction and rehabilitation includes both major bridge locations as well as culvert replacement. |
| D - Developer Project | When a private developer begins a residential or commercial project they also construct the roadways to accommodate access as well as any increased traffic associated with the future development. These projects are managed directly by the developer. It is the City of Edmonton’s responsibility to ensure the developers contractors are complying with the approved design standards and construction specifications in terms of quality; however the direct oversight of the project schedule is managed by the developer. |
| G - Growth Project | Projects that provide necessary infrastructure to address capacity constraints and necessary access connections associated with the long-term road network. These could include new roads in developing areas, or widening of existing arterial roads. |
| L - Street Lights | The removal/replacement of streetlights in the city which have reached the end of their life. Some of these projects would relate to the neighbourhood reconstruction where residents have chosen to have decorative street lights installed. |
| M - Active Modes | The construction or improvement of on-street bicycle facilities, sidewalks and multi-use trails throughout the city. |
| N - In Your Neighbourhood | These projects signify neighbourhood improvements which involve overlays, reconstruction, and microsurfacing. |
| P - Paving | These locations are scheduled for paving. |
| R - Rehabilitation | Rehabilitation primarily involves resurfacing of the roadway, and typically includes minor repairs to sidewalk, curb and gutter. |
| S - Signals | Includes the installation/replacement of full signals, pedestrian/bus actuated signals and crosswalk amber flashers. |
| T - LRT Extension | These projects relate to the expansion of the LRT network throughout Edmonton. |
For more information: