Public involvement is an important part of the design of on-street bike infrastructure. Here we provide a history of previous meetings that took place to help share plans and get input for the planned bike routes.

2013 On-Street Bike Routes Public Involvement

In 2013 11 routes were completed.

Pre-Construction Meeting

April 17, 2013

The City held a meeting to share information on the final design of the 2013 on-street bike routes, overview the construction process, report back on was heard through the public involvement process, and overview the changes that were incorporated in the designs as a result of the input. Background information on cycling and policy direction was also presented.

Display Boards

Presentation

What We Heard

City Council Meeting Presentation

March 13, 2013

Information was presented to Council about progress implementing the Bicycle Transportation Plan. This included information on the program cost, alignment with mandate from City Council, public involvement activities, and design information.

Bicycle Transportation Plan Implementation and Consultation Presentation

Transportation Committee Minutes March 3, 2013 (Item 7.2)

Public Involvement Meetings

February 2013

Two meetings were held to share information about the projects and get feedback on proposed 2013 bike route designs. Background information on cycling and policy direction were also available.

Presentation

2012 On-Street Bike Routes Public Involvement

The City added 15 km of on-street bike routes. A public involvement process was held to share information about the project, get feedback on proposed designs, and provide information prior to construction.

March to May 2012

  • Leger Road (23 Avenue to Leger Way) - March 19
  • 121 Avenue (Victoria Trail to 77 Street) - March 21
  • Wolf Willow Road (east of 170 Street) - March 22
  • 189 Street (87 Avenue to 95 Avenue)
    ***95 Avenue (142 Street to 189 Street) - April 2
  • 121 Street (100 Avenue to 106 Avenue)
    ***100 Avenue (102 Street to 121 Street) - April 3 and 10
  • 82 Street (Yellowhead Trail to 137 Avenue) - April 4
  • 116 Street (87 Avenue to Saskatchewan Drive) - April 5 and 11
  • Pre-construction Information Sessions - May 3 and 10

Fact Sheet

Maps - Central On-Street Bike Route

Maps - North east On-Street Bike Route

Maps - South west On-Street Bike Route

Presentation

What We Heard

For More Information

Urban Transportation

13th Floor, Century Place
9803 – 102A Avenue
Edmonton, Alberta
T5J 3A3

Telephone 311
Email cycling@edmonton.ca