112 Avenue Bridge over Wayne Gretzky Drive Rehabilitation
Rehabilitation on the 112 Avenue Bridge, located over Wayne Gretzky Drive, will begin in spring 2026.
149 Street over Whitemud Drive
Planning and design for the rehabilitation of the 149 Street Bridge over Whitemud Drive is underway.
184 Street Bridge over Yellowhead Trail Rehabilitation
Rehabilitation work on the 184 Street Bridge over Yellowhead Trail is scheduled to begin in summer 2026.
Low Level Bridge Rehabilitation
Rehabilitation on the southbound Low Level Bridge is now complete. Construction on the northbound Low Level Bridge is anticipated for 2027.
Mackenzie Ravine Boardwalk and Stair Renewal
The MacKenzie Ravine Boardwalk and Stairs will be renewed. Removal is anticipated to begin in 2026, with replacement in 2027.