Mill Woods Station Area Plan

A station area plan is being prepared for the area around the future Mill Woods LRT Station.

The plan will determine the location and design of future transit-oriented land uses such as housing, employment and retail as well as supportive infrastructure such as streets and parks.

The City has retained a consulting team led by ParioPlan Inc. to assist with the development of the station area plan in consultation with property owners and other stakeholders.

Public Consultation

Public Workshop #3

RE-SCHEDULED
Wednesday, December 5, 2012
6-8pm; presentation at 6:30pm
South Edmonton Alliance Church, 6508 - 31 Avenue

Materials being reviewed at Public Workshop #3

Mill Woods Station Area Plan (Draft October 2012)
(Large PDF file appx 19MB)

Mill Woods Group A - Panels 1-4
Welcome, Workshop Two: What We Heard, The Station Area Today, Vision and Guiding Principles
(Large PDF file appx 10.5MB

Group B - Panels 5-8
Development Concept, Access and Connectivity, Streets and Open Spaces
(Large PDF file appx 8.2MB

Group C - Panels 9-13
Land Use Precincts, Built Form

Mill Woods Station Area Plan Workshop 3 Workbook
Please fill out the feedback form to help us revise the Draft Mill Woods Station Area Plan and prepare a final plan for presentation to Edmonton City Council in early 2013.

Public Workshop #2 - March 21, 2012

Public Workshop #1 - November 23, 2011

Workshops 1 and 2 included a variety of reports and presentations that outlined the project plans and sought public feedback.

Project Goals

The goals of the station area plan are to:

  • Determine a vision for transit oriented development in Mill Woods.
  • Facilitate appropriate development in the station area.
  • Respect the unique character and history of the Mill Woods area.

Process

The work plan for the project is divided into four phases over a 16 month period:

  • Phase 1: Collection of background information (Aug – Nov 2011)
  • Phase 2: Exploration and evaluation of alternatives (Dec 2011 – May 2012)
  • Phase 3: Preparation of draft station area plan and zoning (June – Nov 2012)
  • Phase 4: Final plan and approvals (Dec 2012 – Feb 2013)

Opportunities for public input will be provided in each phase of the project.

For more information:

Larry Ksionzyk

Title Principal Planner
Telephone

780-496-6198

Email larry.ksionzyk@edmonton.ca