Popular Searches
  • Big Bin Events
  • Canada Day
  • Eco Stations
  • Pay Tickets
  • Permits
  • Property Taxes
  • Spray Parks

Contact Us Visiting?

Rollie Miles Athletic Grounds Track and Field Renewal

Rollie Miles Renewal

Rollie Miles Athletic Grounds is a City-owned and operated facility located in the heart of the Queen Alexandra community. This site is used extensively by community, schools and track clubs serving athletes of all levels.

Renewal of the track, drainage and field elements will provide a public outdoor track and field facility that can support a range of athletic opportunities to serve all citizens and stakeholders now and in the future.

Project Timeline

Build Phase - Project Lifecycle

September 2014 Facility OpensĀ 
Spring 2013 - Fall 2014 Construction
Fall 2012 Design and Tender
June 2012 Public Consultation and Stakeholder Input

Project Overview

Track

  • Replace current 400m Standard Track (8 lanes) with new track surface.
  • Replace drainage infrastructure and track subsurface.

Field Elements

  • With exception of long jump, all field elements will be accomodated inside the track for competition.
  • The existing long jump facility inside the track will be moved to a location outside of track.
  • No changes will be made to existing soccer/football field.

For More Information

Program & Project Development

PO Box 2359
12th Floor CN Tower
Edmonton, AB T5J 2R7

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

Email CMSParkAndFacilityDevelopment@edmonton.ca