Garden Suites

Construction of a new Garden Suite on a single family dwelling lot requires that permits be obtained before you start construction.

 

About the Service

What is a Garden Suite?

In simple terms, a Garden Suite is a separate dwelling unit on a single family home lot.

The Edmonton Zoning Bylaw (12800) specifically defines a Garden Suite as:

  • Garden Suite means a single-storey Accessory Dwelling, which is located in a building separate from the principal use, which is Single Detached Housing.
  • A Garden Suite has cooking facilities, food preparation, sleeping and sanitary facilities which are separate from those of the principal dwelling located on the site.
  • This Use Class does not include Secondary Suites or Garage Suites.

General Permit Information:

Permits are a requirement for many aspects of the construction process including development, building, gas, electrical, plumbing, heating and ventilation work.

Projects are reviewed and assessed according to the Edmonton Zoning Bylaw, the Alberta Building Code and the Safety Codes Permit Bylaw prior to permit approvals.

Process times:
Process time for applications usually take about 6-8 weeks, however actual time frames may vary for each project due to differences in the applications and requirements.

How Do I Obtain the Service?

Updated Application Forms For New Home Construction

As of February 1, 2014, all new home building permit applications will be required under the New Home Buyer Protection Act (Municipal Affairs of the Alberta Government) to supply one of the following before a building permit can be issued:

  • Warranty Confirmation number
    OR,
    An exemption letter from the Alberta Government

Please ensure you use the updated application forms to provide this required information.

For more information about the warranty program see: www.homewarranty.alberta.ca.

Development Permit Requirements

If the residential development permit is for a new building that will be larger than 47 sq. metres (506 sq. ft.), or an addition to or an alteration of an existing building that will result in the building being larger than 47 sq. metres (506 sq. ft.) the Abandoned Wells Confirmation Form must be submitted with a printout of the map(s) that was used to confirm the absence/presence of abandoned well(s) with the permit application form.

Construction or renovation of a garden suite requires a development permit.

For a new Garden Suite

  • Complete the "Garage with Garage or Garden Suite Application Form"
  • Supply the required documentation as indicated on the application form
  • Include the applicable fees

For renovations to an existing Garden Suite

The suite must already have received its initial development and building permit to be used as a Garden Suite. 

The suite must already have received its initial development and building permit to be used as a Garden Suite.

If the Garden Suite hasn't received all of its approvals and permits previously, the applicant should use the same application form and documentation requirements as explained in the "new garden suite" section (above).

Inspections

After your application has been reviewed and the appropriate permits(s) issued, applicants are required to contact the City of Edmonton Call Centre at 311 and arrange for inspections. All inspections must be passed before any person can occupy the garden suite.

To prepare for the required inspections in occupied homes, please ensure:

  • an individual 18 years of age or older who is responsible for the property is present during the inspection
  • clear and unobstructed access to all areas of inspection is provided
  • all pets are securely contained

Please note: the Safety Codes Officers are required to wear shoes while performing their duties in your home.

FaxFax: 780-496-6054
In Person

Sustainable Development
5th floor, 10250-101 Street NW
Edmonton, Alberta  T5J 3P4

Office Hours: 8am-4:30pm.
Monday to Friday.
Mail

Sustainable Development
5th floor, 10250-101 Street NW
Edmonton, Alberta  T5J 3P4

Fees

Fees

For new construction and existing garden suites that have been built without permits

Fees are based on the square footage of the building that is being constructed.

An additional $102 notification fee will be added to all garage or garden suite combo permits that are Class B or require a variance.

For renovations to an existing Garden Suite that has already been issued its original Development & Building Permit:

Development Permit:

  • Permit Fees may vary depending on the scope of the construction.

Building Permit:

Fee will be the total of your Building Permit (based on the construction value of your Secondary Suite renovation) plus a safety code fee, which is charged on all Building Permits

2016 rates

Value of Construction

Building Permit

Safety Code Fee

$0 - $5,000

$102

$4.50

$5,001 - $10,000

$148

$5.92

$10,001 - $25,000

$255

$10.30

$25,001 - $50,000

$475

$19.00

$50,001 - $100,000

$922

$36.88

Over $100,000

$1,796

$71.84

Construction Value includes:

  • Building Components (all materials used in the construction of the building including all building services, electrical, fire alarm and detection systems, and fire protection equipment)
  • Plumbing components (fixtures, drainage system, venting systems, water systems or any part thereof)
  • Electrical components
  • Heating components (systems and equipment for heating, ventilating and air-conditioning)

Construction value does NOT include furnishings, rugs, floor coverings, curtains etc.

Waste management fees

If you are developing a secondary suite, a garage suite or garden suite, you need to know that your Waste Management Services Fee is affected.

Contact the City About This Service

For More Information

Permits and Licensing Service Centre

Sustainable Development
5th floor, 10250 - 101 Street
Edmonton, AB T5J 3P4

Hours of Operation:
Monday to Friday
8am to 4:30pm

Telephone

In Edmonton: 311

Outside Edmonton: 780-442-5311

Fax 780-496-6054

FAQ

How do I know if a Garden Suite that has been built on my property has already received the required approvals and permits?

Many properties within Edmonton may have had Garden Suites constructed without permits. This does not exempt them from the requirement of obtaining permits. In order to find out if permits have been issued for a Garden Suite at your property, submit a "Search of Record" application form to search for Development and Building Permit approvals for that Garden Suite.

Note: you must either be the owner of the property or have written consent from the owner, to apply for a Search of Records.

How do I see if my property is zoned for a Garden Suite?

To see if your property is zoned for a Garden Suite, check your properties zoning designation using the Edmonton Maps page.

  • click "enter" to go into program and then "OK" to acknowledge disclaimer
  • click on "locate - address" or "locate-legal description"
  • Enter in your address and then click "search"
  • click on " zoning for this address"
  • click on "current Zone(s)" (eg. "RF1")

This will then bring you to the Edmonton Zoning Bylaw page where you are able to check to see if Garden Suites are a listed use for that Zone.

What other Zoning regulations are applicable to Secondary Suites?

To see additional Zoning regulations to to the Edmonton Zoning Bylaw page.

Part I - General Development Regulations

  • Section 54 (Parking - see 54.2 and 54.2 Schedule 1

Part I - Special Land Use Provisions

  • Section 87 - Garage and Garden Suites

Part II Overlays (may be applicable)

  • Section 822  - Edmonton - Strathcona County Joint Planning Study Area Secondary and Garage and Garden Suite Overlay

For help interpreting these regulations, please contact the City of Edmonton Call Centre (311) and ask to speak with a Development Technical Advisor.